Make sure that you've got adequate disk Area on both of those cPanel and Plesk servers. The space available within the resource really should be no less than the same as the level of data transferred. As well as desired destination must have at the very least 5 GBs over https://pleskinstall67888.blogsvirals.com/27658079/about-cpanel-to-plesk-migration